Starter Assembly: Remove, Install, and Overhaul
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4, 16 Valve Eng | 5.9 | B | ||
| In-Line4, 8 Valve Eng | 5.2 | B |