FixVault

Starter Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Topaz GS, 2D Sedan, 2.3 S, which is a different variant/trim than selected.
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
Automatic Trans,Gas1.91.4B
Combination Procedure: STARTER FIELD COILS: Remove, Install, and Overhaul:
0.4B