Power Distribution Center: Operation
WARNING: This page is about a different car, the 2004 Dodge Sprinter. However, it is still accessible from the selected car via links, so may be relevant.
All of the current from the battery and the generator output enters the PDC through the positive battery cable. The PDC cover is removed to access the battery and generator output connection B(+) terminal studs. Internal connection of all of the PDC circuits is accomplished by an intricate combination of hard wiring and bus bars. Refer to SYSTEM WIRING DIAGRAMS for the location of complete PDC circuit diagrams.