FixVault

3.0 Applying the adhesive

WARNING: This page is about a different car, the 2013 BMW 550i GT, 2012 BMW 550i GT, 2011 BMW 550i GT, and 2010 BMW 550i GT. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: The hole must be completely filled or sealed with adhesive!
Fig 1: Identifying Adhesive Applying Areas On Hole And Roof Channel
G08476102Courtesy of BMW OF NORTH AMERICA, INC.

Apply adhesive bead (1) to the underside of the clip.

In so doing, fill channel of clip with adhesive.

Fig 2: Applying Adhesive Bead To Underside Of Clip
G08476103Courtesy of BMW OF NORTH AMERICA, INC.

Move clip (1) into position and secure by hand.

If the adhesive is not already emerging evenly through the channel, apply additional adhesive from above.

Adhesive bead (2) must be below the clip height.

Fig 3: Applying Adhesive Bead Below Clip Height
G08476104Courtesy of BMW OF NORTH AMERICA, INC.

Secure clip with adhesive tape (1), approx. 150 mm long.

Apply adhesive tape in direction of travel.

Fig 4: Identifying Adhesive Tape Applying Areas On Roof Strip
G08476105Courtesy of BMW OF NORTH AMERICA, INC.