Structure and inner electrical connection

The air-distribution-flap motor is connected via a 4-pin plug connection with the control unit of the heater/air conditioning system.

The flap motors are switched in series on the LIN bus. The pin assignment depends on the installation location of the flap motor. If the flap motor is the last flap motor in the topology in the series connection of the LIN bus, only 3 pins are used.

The graphic below shows the flap motor with 4 pins used.

G11650560Courtesy of BMW OF NORTH AMERICA, INC.
Index Explanation
1 Electronic component
2 Air distribution flap motor
PIN ASSIGNMENT SPECIFICATION

Pin Explanation
Terminal 31L Terminal 31L, load earth
LIN in LIN bus input
LIN out* LIN bus output
U Supply voltage

The graphic below shows the flap motor with 3 pins used.

G11650561Courtesy of BMW OF NORTH AMERICA, INC.
Index Explanation
1 Electronic component
2 Air distribution flap motor
PIN ASSIGNMENT SPECIFICATION

Pin Explanation
Terminal 31L Terminal 31L, load earth
LIN LIN bus
U Supply voltage
1 pin not used