Vacuum Pump Relay
- With the power switched off, verify continuity between terminal Nos. 3 and 4. SeeFig 1 . Next, confirm that no continuity exists between terminal Nos. 1 and 2.
- Apply power to the system to inspect for continuity between terminal Nos. 1 and 2. Continuity should also exist between terminal Nos. 3 and 4.