Carburetor - MIKUNI 2-Bbl: Overhaul: Reassembly
- To reassembly, reverse disassembly procedure. ensure that all air and fuel passages are clear. Lubricate linkage after cleaning. Check throttle and choke linkage for smooth operation.
- Be sure that sub-EGR valve is operating smoothly. If a main or pilot jet is of the same size. A number is stamped on each jet.
- To prevent carburetor-to-intake manifold gasket from being installed incorrectly, match holes of gasket to throttle body. Place gasket on intake manifold.
NOTE:
For specifications, see ADJUSTMENTS
.