FixVault

Solenoid - EVAP/Purge: Installation

Fig 1: Identifying Solenoid, Bracket, Brake Power Booster, Electrical Wiring Connector And Vacuum Lines
G04853448Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  1. Install solenoid assembly (2) to mounting bracket (1).
  2. Connect vacuum lines (5) and (6).
  3. Connect electrical connector (3).
  4. The vapor/vacuum lines and hoses must be firmly connected. Check the vapor/vacuum lines at the ESIM switch, pump filter and EVAP canister purge solenoid for damage or leaks. If a leak is present, a Diagnostic Trouble Code (DTC) may be set  .