Continuity Check
Remove the LIN cutoff control unit. (Refer to << A >> REMOVAL OF LIN CUTOFF CONTROL UNIT )
CONTINUITY CHECK
| Terminal number | Measurement value |
|---|---|
| 5 to 3 | Continuity exists (2 Ω or less) |
Remove the LIN cutoff control unit. (Refer to << A >> REMOVAL OF LIN CUTOFF CONTROL UNIT )
| Terminal number | Measurement value |
|---|---|
| 5 to 3 | Continuity exists (2 Ω or less) |