Removal And Installation: Notes
Pre-removal and Post-installation Operation
- Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal and Installation (Refer to UNDER COVER ).
- Engine Coolant Draining and Refilling (Refer to ENGINE COOLANT CHANGE ).
- Engine Oil Draining and Refilling (Refer to ENGINE OIL REPLACEMENT ).
- Engine Cover Removal (Refer to ENGINE COVER ).
- Charge air cooler Intake Air Hose A Removal and Installation (Refer to CHARGE AIR COOLER ).
- Air Cleaner Assembly Removal and Installation (Refer to AIR CLEANER ).
- Front Exhaust Pipe Removal and Installation (Refer to EXHAUST PIPE, MAIN MUFFLER AND CATALYTIC CONVERTER ).
- Strut Tower Bar Removal and Installation (Refer to REMOVAL AND INSTALLATION ).