Removal And Installation: Notes
Pre-removal operation
|
Post-installation operation
|
| Removal steps | |
|---|---|
| 1. Air by-pass valve vacuum hose connection | |
| 2. Brake booster vacuum hose connection | |
| 3. Rocker cover PCV hose connection | |
| 4. Purge hose canister connection | |
| 5. Purge hose intake manifold connection | |
| 6. Purge control solenoid valve | |
| >>B<< | 7. Manifold absolute pressure sensor |
| >>B<< | 8. O-ring |
| 9. Throttle body stay | |
| 10. Harness bracket | |
| >>A<< | 11. Intake manifold stay |
| >>A<< | 12. Intake manifold |
| 13. Gasket | |