FixVault

Work Procedure

  1. DISTANCE SENSOR CONFIGURATION 

    Perform the distance sensor configuration with M.U.T.-III SE. Refer to WORK PROCEDURE .

    >>

    GO TO  2.

  2. PERFORM RADAR ALIGNMENT 

    Perform the radar alignment. Refer to WORK PROCEDURE .

    >>

    GO TO  3.

  3. AEB SYSTEM ACTION TEST 
    1. Perform the following system action test.
    2. Check that the each system operates normally.

    >>

    INSPECTION END