Air Conditioning Switch
Connect voltmeter between control unit connector terminal 22 and ground. With switch "ON", 12 volts should be measured. With switch "OFF", 0 volts should be measured. If not correct, check harness or replace switch.
Connect voltmeter between control unit connector terminal 22 and ground. With switch "ON", 12 volts should be measured. With switch "OFF", 0 volts should be measured. If not correct, check harness or replace switch.