FixVault

Power Steering Pressure Sensor

WARNING: This page is about a different car, the 2004 Nissan Murano. However, it is still accessible from the selected car via links, so may be relevant.
  1. Reconnect all harness connectors disconnected.
  2. Start engine and let it idle.
  3. Check voltage between ECM terminal 12 and ground under the following conditions.
    Fig 1: ECM Voltage Specifications
    G00782624Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Checking Voltage Between ECM Terminal And Ground
    G00782625Courtesy of NISSAN MOTOR CO., U.S.A.