FixVault

Diagnostic Procedure

  1. CHECK INPUT SIGNAL 

    With CONSULT-II 

    1. Start engine.
    2. Select "TCM INPUT SIGNALS" in "DATA MONITOR" mode for "A/T" with CONSULT-II.
    3. Read out the value of "TURBINE REV". Check the value changes according to engine speed.
      NOTE: "TURBINE REV" in "TCM INPUT SIGNALS" means power train revolution sensor.
      Fig 1: Checking Input Signal
      G02062884Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    1. OK: GO TO  4.
    2. NG: GO TO 2.
  2. CHECK POWER TRAIN REVOLUTION SENSOR (With CONSULT-II) 

    With CONSULT-II 

    1. Start engine.
      Fig 2: Checking Power Train Revolution Sensor (With Consult-II)
      G02062885Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    1. OK: GO TO  4.
    2. NG: GO TO 3.
  3. CHECK POWER TRAIN REVOLUTION SENSOR (Without CONSULT-II) 

    Without CONSULT-II 

    Check the power train revolution sensor. Refer to "COMPONENT INSPECTION ".

    OK or NG 

    1. OK: Harness for short or open between TCM, ECM and revolution sensor
    2. NG: Replace power train revolution sensor.
  4. CHECK DTC 

    Perform "DIAGNOSTIC TROUBLE CODE (DTC) CONFIRMATION PROCEDURE ".

    OK or NG 

    1. OK: INSPECTION END 
    2. NG: GO TO 5.
  5. CHECK TCM INSPECTION 
    1. Perform TCM input/output signal inspection.
    2. If NG, recheck TCM pin terminal for damage or loose connection with harness connector.

    OK or NG 

    1. OK: INSPECTION END 
    2. NG: Repair or replace damaged parts.