FixVault

Overall Function Check

Use this procedure to check the overall function of the park/neutral position (PNP) switch circuit. During this check, a 1st trip DTC might not be confirmed.

WITH GST 

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 22 and body ground under the following conditions.
    Fig 1: Checking Voltage Between ECM Terminal 22 And Body Ground
    G00742352Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Reference Data
    G00742351Courtesy of NISSAN MOTOR CO., U.S.A.
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".