FixVault

Power Steering Pressure Sensor

  1. Reconnect all harness connectors disconnected.
  2. Start engine and let it idle.
  3. Check voltage between ECM terminal 12 and ground under the following conditions.
    Fig 1: Voltage Condition Chart
    G00780792Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Checking Voltage Between ECM Terminal 12 And Ground
    G00780793Courtesy of NISSAN MOTOR CO., U.S.A.