FixVault

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 & Ground
    G00778880Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Voltage & Condition Table
    G00778879Courtesy of NISSAN MOTOR CO., U.S.A.