FixVault

Operation Procedure

WARNING: This page is about a different car, the 2006 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
  1. Connect the CONSULT-II and CONSULT-II CONVERTER to the data link connector and start the engine.
    CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on control unit which carries out CAN communication.
  2. Touch "START (NISSAN BASED VHCL)" on the display screen.
  3. Touch "ABS".

    If "ABS" is not indicated, go to "CONSULT-II DATA LINK CONNECTOR (DLC) CIRCUIT ".

  4. Touch "ACTIVE TEST".
  5. The test item selection screen is displayed.
  6. Touch necessary test item.
    Fig 1: CONSULT-II Screen Display - Active Test
    G04175513Courtesy of NISSAN MOTOR CO., U.S.A.
  7. With the "MAIN SIGNALS" display selected, touch "START".
  8. The Active Test screen will be displayed, so conduct the following test.