Latch Release Actuator System Inspection
WARNING: This page is about a different car, the 2008 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
- LATCH RELEASE ACTUATOR SIGNAL INSPECTION
- Turn ignition switch OFF.
- While opening the sliding door, check voltage between sliding door latch control unit connector D204 (LH) or D304 (RH) terminal 10 and ground.TERMINALS VOLTAGE CHART
Terminals Measuring condition Voltage (V) (Approx.) ( + ) ( - ) 10 Ground Latch release actuator operation (opening door) 0 → Momentarily above 0 Other than above 0
OK or NG
OK: Latch release actuator is OK.
NG: GO TO 2.
- LATCH RELEASE ACTUATOR CIRCUIT INSPECTION
- Disconnect latch release actuator and sliding door latch control unit.
- Check continuity between latch release actuator connector D206 (LH) or D306 (RH) terminal 2 and sliding door latch control unit connector D204 (LH) or D304 (RH) terminal 10.
2 - 10 : Continuity should exist.
OK or NG
OK: GO TO 3.
NG: Repair or replace harness.
- LATCH RELEASE ACTUATOR GROUND INSPECTION
- Close the sliding door.
- Check continuity between latch release actuator connector D206 (LH) or D306 (RH) terminal 1 and ground.
1 - Ground : Continuity should exist.
OK or NG
OK: Replace the latch release actuator.
NG: Repair or replace harness.