FixVault

Power Steering Pressure Sensor

WARNING: This page is about a different car, the 2006 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
  1. Reconnect all harness connectors disconnected.
  2. Start engine and let it idle.
  3. Check voltage between ECM terminal 12 and ground under the following conditions.
    POWER STEERING PRESSURE SENSOR VOLTAGE

    Condition Voltage
    Steering wheel is being turned. 0.5 - 4.5V
    Steering wheel is not being turned. 0.4 - 0.8V
    Fig 1: Identifying Voltage Between ECM Terminal 12 And Ground
    G04196964Courtesy of NISSAN MOTOR CO., U.S.A.