Removal And Installation: Removal

WARNING: This page is about a different car, the 2004 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove engine room cover with power tool. Refer to ENGINE ROOM COVER .
  2. Remove air duct and resonator assembly (inlet). Refer to AIR CLEANER AND AIR DUCT  (for left bank only).
  3. Move harness on upper rocker cover and its peripheral aside.
  4. Remove electric throttle control actuator loosening bolts diagonally (for left bank only).
  5. Remove ignition coil. Refer to IGNITION COIL .
  6. Remove PCV hose from PCV control valve.
  7. Loosen bolts in REVERSE ORDER shown using power tool.
    CAUTION: Do not hold the rocker cover by the oil filler neck (right bank).
    Fig 1: Rocker Cover Torque Sequence
    G00343720Courtesy of NISSAN MOTOR CO., U.S.A.