FixVault

Diagnostic Procedure

  1. CHECK GROUND CONNECTIONS 
    1. Turn ignition switch OFF.
    2. Loosen and retighten two ground screws on the body. Refer to GROUND INSPECTION .
    Fig 1: Checking Ground Connections
    G02466145Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    • OK: GO TO  2.
    • NG: Repair or replace ground connections.
  2. CHECK ENGINE COOLANT TEMPERATURE SENSOR 

    Refer to COMPONENT INSPECTION .

    OK or NG 

    • OK: GO TO  3.
    • NG: Replace engine coolant temperature sensor.
  3. CHECK THERMOSTAT OPERATION 

    When the engine is cold [lower than 70°C (158°F)] condition, grasp lower radiator hose and confirm the engine coolant does not flow.

    OK or NG 

  4. CHECK INTERMITTENT INCIDENT 

    Refer to TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT . For circuit, Refer to WIRING DIAGRAM .

    • INSPECTION END