FixVault

Without CONSULT-II

Check air passage continuity and operation delay time under the following conditions.

Fig 1: Checking Air Passage Continuity Operation
G02474672Courtesy of NISSAN MOTOR CO., U.S.A.
AIR PASSAGE CONTINUITY TABLE

Condition Air passage continuity between A and B Air passage continuity between A and C
12V direct current supply between terminals 1 and 2 Yes No
No supply No Yes