FixVault
Home
›
Nissan-Datsun
›
2008
›
Frontier XE
›
Repair and Diagnosis
›
Engine Performance
›
Engine Control Systems
›
Engine Control System (Qr25DE)
›
Basic Inspection
›
Inspection And Adjustment
›
Idle Speed and Ignition Timing Check
›
Ignition Timing
›
Method A
Method A
Attach timing light to loop wire as shown.
Fig 1: Attaching Timing Light To Loop Wire
Courtesy of NISSAN MOTOR CO., U.S.A.
Check ignition timing.
Fig 2: Identifying Timing Indicator
Courtesy of NISSAN MOTOR CO., U.S.A.