FixVault

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 69 (PNP switch signal) and ground under the following conditions.
    VOLTAGE CHART

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    Approx. 0
    Except above BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 69 (PNP Switch Signal) And Ground
    G04925504Courtesy of NISSAN MOTOR CO., U.S.A.