FixVault

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    TERMINALS VOLTAGE CHART

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    Approx. 0
    Except above BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G04900583Courtesy of NISSAN MOTOR CO., U.S.A.