FixVault

Control Valve And TCM Removal And Installation: Installation

WARNING: This page is about a different car, the 2007 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: After completing installation, check A/T fluid leakage and fluid level. Refer to "A/T FLUID ".
  1. Connect TCM connector and park/neutral position switch connector.
    Fig 1: Connecting TCM Connector And Park/Neutral Position (PNP) Switch Connector
    G04875922
  2. Install A/T assembly harness connector to control valve with TCM.
    Fig 2: Identifying A/T Assembly Harness Connector
    G04875924
  3. Connect TCM connector.
    Fig 3: Connecting TCM Connector
    G04875920
  4. Install new O-ring in A/T assembly harness connector.
    CAUTION:
    • Do not reuse O-ring.
    • Apply ATF to O-ring.
      Fig 4: Identifying New O-Ring In A/T Assembly Harness Connector
      G04875919
  5. Install A/T fluid temperature sensor 2 to bracket.
    Fig 5: Identifying A/T Fluid Temperature Sensor 2 Connector
    G04875918
  6. Install A/T fluid temperature sensor 2 (with bracket) to control valve with TCM. Tighten A/T fluid temperature sensor 2 bolt to the specified torque. Refer to "COMPONENTS ".
    CAUTION: Adjust bolt hole of bracket to bolt hole of control valve with TCM.
    Fig 6: Adjusting Bolt Hole Of Bracket
    G04875917
  7. Install control valve with TCM in transmission case.
    CAUTION:
    • Make sure that turbine revolution sensor is securely installed into turbine revolution sensor hole.
    • Hang down revolution sensor harness toward outside so as not to disturb installation of control valve with TCM.
    • Adjust A/T assembly harness connector of control valve with TCM to terminal hole of transmission case.
      Fig 7: Adjusting A/T Assembly Harness Connector Of Control Valve With TCM
      G04875929
    • Assemble it so that manual valve cutout is engaged with manual plate projection.
      Fig 8: Assembling Manual Valve Cutout
      G04875916
  8. Install bolts (A), (B) and (C) in control valve with TCM.
    BOLT LENGTH CHART

    Bolt symbol Length mm (in) Number of bolts
    A 42 (1.65) 5
    B 55 (2.17) 6
    C 40 (1.57) 1
    Fig 9: Identifying Bolts Location
    G04901118
  9. Tighten bolt (1), (2) and (3) temporarily to prevent dislocation. After that tighten them in order (1 --> 2 --> 3). Then tighten other bolts.
  10. Tighten control valve with TCM bolts to the specified torque. Refer to "COMPONENTS ".
    Fig 10: Identifying TCM Bolt
    G04901135
  11. Connect A/T fluid temperature sensor 2 connector.
  12. Securely fasten terminal cord assembly and A/T fluid temperature sensor 2 harness with terminal clips.
    Fig 11: Connecting A/T Fluid Temperature Sensor 2 Connector
    G04901115
  13. Connect revolution sensor connector.
  14. Securely fasten revolution sensor harness with terminal clip.
    Fig 12: Identifying Terminal Clip
    G04875914
  15. Install oil pan to transmission case. Refer to "INSTALLATION ".
  16. Pull up A/T assembly harness connector.
    CAUTION: Do not damage connector.
    Fig 13: Identifying A/T Assembly Harness Connector
    G04875939
  17. Install snap ring to A/T assembly harness connector.
  18. Connect A/T assembly harness connector.
  19. Connect the negative battery terminal.
  20. Refill the A/T with fluid and check the fluid level and for fluid leakage. Refer to "A/T FLUID ".
    Fig 14: Identifying A/T Assembly Harness Connector
    G04875940