Overall Function Check

Use this procedure to check the overall function of the park/neutral position (PNP) switch circuit. During this check, a 1st trip DTC might not be confirmed.

WITH GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 69 (PNP switch signal) and ground under the following conditions.
    SHIFT LEVER CONDITION

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    BATTERY VOLTAGE (11 - 14V)
    Except above Approx. 0
  3. If NG, go to "DIAGNOSIS PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 69 (PNP Switch Signal) And Ground