Front Power Window Motor LH Circuit Inspection
- CHECK MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH OUTPUT SIGNAL
- Turn ignition switch OFF.
- Check voltage between main power window and door lock/unlock switch connector D7 terminals 8, 11 and ground.VOLTAGE SPECIFICATION
Connector Terminals Condition Voltage (V) (Approx.) (+) (-) D7 8 Ground UP Battery voltage DOWN 0 11 UP 0 DOWN Battery voltage Fig 1: Checking Voltage Between Main Power Window And Door Lock/Unlock Switch Connector D7 Terminals 8, 11 And GroundCourtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: GO TO 2.
NG: Replace main power window and door lock/unlock switch. Refer to "REMOVAL AND INSTALLATION ".
- CHECK POWER WINDOW MOTOR CIRCUIT
- Turn ignition switch OFF.
- Disconnect main power window and door lock/unlock switch and front power window motor LH.
- Check continuity between main power window and door lock/unlock switch connector and front power window motor LH connector.CONTINUITY SPECIFICATION
Connector Terminal Connector Terminal Continuity A B Main power window and door lock/unlock switch: D7 8 Front power window motor LH: D9 2 Yes 11 3 Yes - Check continuity between main power window and door lock/unlock switch connector and ground.CONTINUITY SPECIFICATION
Connector Terminal Ground Continuity A Main power window and door lock/unlock switch: D7 8 No 11 No OK or NG
OK: Replace front power window motor LH. Refer to FRONT DOOR GLASS AND REGULATOR .
NG: Repair or replace harness.