FixVault

Diagnosis Procedure

  1. CHECK GROUND CONNECTIONS
    1. Turn ignition switch OFF.
    2. Loosen and retighten ground screws on the body.

    Refer to "GROUND INSPECTION ".

    Fig 1: Identifying Body Ground (E9 And E15) And Washer Tank With Fuse And Fusible Link Box
    G08185097Courtesy of NISSAN NORTH AMERICA, INC.

    OK or NG 

    OK: GO TO 2.

    NG: Repair or replace ground connections.

  2. CHECK ENGINE COOLANT TEMPERATURE SENSOR

    Refer to "COMPONENT INSPECTION ".

    OK or NG 

    OK: GO TO 3.

    NG: Replace engine coolant temperature sensor. Refer to , "COMPONENT ".

  3. CHECK THERMOSTAT OPERATION

    When the engine is cold [lower than 70°C (158°F)] condition, grasp lower radiator hose and confirm the engine coolant does not flow.

    OK or NG 

    OK: GO TO 4.

    NG: Repair or replace thermostat. Refer to REMOVAL AND INSTALLATION .

  4. CHECK INTERMITTENT INCIDENT

    Refer to TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT .

    Refer to "WIRING DIAGRAM ".

    INSPECTION END