FixVault
Home
›
Nissan-Datsun
›
2014
›
370Z Base, 2D Convertible, Automatic Trans
›
Repair and Diagnosis
›
Engine Performance
›
System
›
Engine Control System (Introduction)
›
Basic Inspection
›
Inspection And Adjustment
›
Ignition Timing
›
IGNITION TIMING: Special Repair Requirement
IGNITION TIMING: Special Repair Requirement
CHECK IGNITION TIMING
Attach timing light to loop wire as shown in the figure.
Fig 1: Attaching Timing Light To Loop Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
: INSPECTION END