FixVault

Diagnosis Procedure

  1. CHECK BCM POWER SUPPLY AND GROUND CIRCUIT

    Check BCM power supply and ground circuit.

    Refer to DIAGNOSIS PROCEDURE .

    Is the inspection result normal?

    YES 

    GO TO STEP 2  .

    NO 

    Repair or replace the malfunctioning parts.

  2. CHECK MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH POWER SUPPLY AND GROUND CIRCUIT

    Check main power window and door lock/unlock switch power supply and ground circuit.

    Refer to DIAGNOSIS PROCEDURE .

    Is the inspection result normal?

    YES 

    GO TO STEP 3  .

    NO 

    Repair or replace the malfunctioning parts.

  3. REPLACE MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH

    • Replace main power window and door lock/unlock switch.
    • Confirm the operation after replacement.

    Is the inspection result normal?

    YES 

    Inspection End.

    NO 

    Check intermittent incident. Refer to INTERMITTENT INCIDENT .