FixVault

Inspection Before Assembly

Side Cover Assembly 

Install new seal ring SYMBOL to side cover and measure clearance (A) between seal ring and groove with thickness gage.

GNSJSDIA6315Z-315Courtesy of NISSAN NORTH AMERICA, INC.

Clearance (A)

: Refer to Side Cover .

CAUTION: Replace side cover assembly if clearance exceeds indicated value.

High Clutch Assembly 

Install new seal ring SYMBOL to high clutch assembly and measure clearance (A) between seal ring and groove with thickness gage.

GNSJSDIA6314Z-314Courtesy of NISSAN NORTH AMERICA, INC.

Clearance (A)

: Refer to High Clutch .

CAUTION: Replace high clutch assembly if clearance exceeds indicated value.