FixVault

Removal and Installation: Removal

  1. Disconnect the negative battery terminal. Refer to Removal and Installation .
  2. Remove the front kicking plate (LH). Refer to Removal and Installation - Front Kicking Plate .
  3. Remove the dash side finisher (LH). Refer to Removal and Installation .
  4. Remove the instrument lower panel LH. Refer to Removal and Installation .
  5. Disconnect the fuse box and the harness connectors.
  6. Remove the bolt (A), then pull out the BCM (1).
    GNSALMIA0690Z-690Courtesy of NISSAN NORTH AMERICA, INC.
  7. Disconnect the harness connectors from the BCM and remove.