FixVault

Component Function Check

  1. CHECK QUICK CHARGE PERMIT SIGNAL CIRCUIT 

    SYMBOL With CONSULT

    1. Turn power switch ON.
    2. Select "Quick charge permit signal circuit" in "ACTIVE TEST" mode of "EV/HEV" using CONSULT.
    3. Select "Quick Charge Permit" of "DATA MONITOR" item.
    4. Switch the quick charge permit signal circuit between ON and OFF to check that the "Quick Charge Permit" indication changes.
    5. Switch the quick charge permit signal circuit between ON and OFF to check that the "Quick Charge Permit" indication changes, also change the voltage between quick charge port harness connector and ground.
      Monitor item Conditions (Active test) Indication
      Quick Charge Permit Quick charge permit signal circuit ON ON
      OFF OFF
      + - Conditions (Active test) Voltage
      Quick charge port
      Terminal
      4 Body ground Quick charge permit signal circuit ON 1.0 V or less
      OFF OPEN

    Is the inspection result normal?

    YES>>

    INSPECTION END

    NO>>

    Refer to Diagnosis Procedure .