Oil Flow Check Valve: Remove & Replace
WARNING: This page is about the Cutlass Supreme Base, 2D Coupe, 2.3 D, 125C/MD9, which is a different variant/trim than selected.
Includes: R&I Cylinder Head(s).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4,2.3L Eng, Quad 4 | 8.9 | B | ||
| Additional Procedure: OIL FLOW CHECK VALVE: Remove & Replace: | ||||
| Where Air Cond interferes add | 0.5 | B | ||
| Where Elect Eng System interferes add | 0.5 | B | ||
| Where Pwr Strg Interferes add | 0.3 | B | ||