FixVault

Installation Procedure

  1. Position the data link connector to the instrument panel.
  2. Install the screws to the data link connector.

    Tighten 

    Tighten the data link connector screws to 2 N.m (18 lb in).

Fig 1: Installing Steering Column Filler & Screws
G01830432Courtesy of GENERAL MOTORS CORP.