FixVault

Rocker Arm Assembly: Remove, Install, and Overhaul

Includes: R&I Cylinder Head(s) and adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
Gas, Both18.2B
Gas, Left10.0B
Gas, Right9.5B
Additional Procedure: ROCKER ARM ASSEMBLY: Remove, Install, and Overhaul:
Where Air Cond interferes add0.5B