Test VER-1 - Verification Procedure

NOTE: For connector terminal identification, see CONNECTOR IDENTIFICATION  . For wiring diagram, see the appropriate WIRING DIAGRAMS article in the ENGINE PERFORMANCE section.

Reconnect all components and connectors that were disconnected for testing. Verify all repairs have been made. Turn ignition off, then back on. Using scan tool, clear all trouble codes and actuate system which was not operational. If system operates properly, repair is complete. If system is still malfunctioning, go to TEST 1A.