FixVault

Installation Procedure

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2002 GMC Yukon XL, 2002 GMC Yukon, 2002 Chevrolet Tahoe, 2002 Chevrolet Suburban, and 2002 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Linkage Rod & Latch Assembly
    GM352941Courtesy of GENERAL MOTORS CORP.
  1. Engage the linkage rod to the latch assembly.
  2. Install the latch assembly to the vehicle.
  3. Fig 2: Latch Assembly Bolts
    GM352940Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE .
  4. Install the latch assembly bolts.

    Tighten:  Tighten the bolts to 25 N.m (18 lb ft).

  5. Fig 3: View Of Support Cable At Mounting Bolt
    GM388060Courtesy of GENERAL MOTORS CORP.
  6. Connect the cables on each side of the endgate to the side panel cable retainer bolts.
  7. Fig 4: Handle Linkage Rods
    GM347054Courtesy of GENERAL MOTORS CORP.
  8. Engage the linkage rods (1).
  9. Raise the endgate.
  10. Fig 5: Endgate Handle Bezel
    GM366585Courtesy of GENERAL MOTORS CORP.
  11. Install the endgate handle bezel. Pressing into place until fully seated.
  12. Fig 6: Endgate Handle & Bolts
    GM366584Courtesy of GENERAL MOTORS CORP.
  13. Tighten the handle bolts.

    Tighten:  Tighten the bolts to 25 N.m (18 lb ft).