FixVault

Installation Procedure

WARNING: This page is about a different car, the 2003 Pontiac Aztek and 2003 Buick Rendezvous. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install sun load sensor.
  2. Connect the sunload sensor electrical connector.
  3. Align the I/P upper trim locating pins and the retainers to the slots in the I/P.
    Fig 1: Connecting Sunload Sensor Electrical Connector
    G01499297Courtesy of GENERAL MOTORS CORP.
  4. Push forward and down on the I/P upper trim panel to lock into place.
  5. Install the windshield garnish molding. Refer to GARNISH MOLDING REPLACEMENT -- WINDSHIELD PILLAR .
    Fig 2: Pushing Forward And Down On I/P Upper Trim Panel To Lock Into Place
    G01499298Courtesy of GENERAL MOTORS CORP.