FixVault

Test Description

  1. 2

    Listen for a click when the relay operates. Command both the ON and OFF states. Repeat the commands as necessary.
  2. 3

    This step tests for voltage at the switch feed.
  3. 4

    This step verifies that the control module is providing a ground.
  4. 5

    This step tests if ground is constantly being applied.