FixVault

Installation Procedure

  1. Install the quarter window into the opening. Refer to URETHANE ADHESIVE INSTALLATION OF STATIONARY WINDOWS  .
  2. Install the upper quarter window trim panel. Refer to TRIM PANEL REPLACEMENT -- REAR QUARTER UPPER (AZTEK) or TRIM PANEL REPLACEMENT -- REAR QUARTER UPPER (RENDEZVOUS) .
  3. Remove the double layer of masking tape around the perimeter of the painted surfaces and the interior trim.
  4. Close the liftgate.