FixVault

Installation Procedure

  1. Install the ball stud to the rear axle tie rod.

    Tighten 

    Tighten the height sensor ball stud to 4 N.m (35 Ib in).

  2. Install the automatic level control sensor link to the tie rod ball stud.
  3. Lower the vehicle.
  4. Install the ELC/TRAILER fuse.
    Fig 1: Installing Ball Stud To Rear Axle Tie Rod
    G01499743Courtesy of GENERAL MOTORS CORP.