FixVault

Installation Procedure

    Fig 1: View Of Battery
    GM74060Courtesy of GENERAL MOTORS CORP.
  1. Install and route the fuse block cable in the vehicle.
  2. Install the battery positive fuse block cable to the stud.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the I/P wiring harness junction block nut.

    Tighten:  Tighten the I/P wiring harness junction block nut to 10 N.m (89 lb in).

  4. Reposition the junction block nut boot.
  5. Install the battery positive fuse block cable to the stud.
  6. Install the positive battery cable lead to the stud.
  7. Install the positive battery cable nut.

    Tighten:  Tighten the positive battery cable nut to 10 N.m (89 lb in).

  8. Close the stud cover on the fuse/relay center cover.
  9. Install the battery tray. Refer to Battery Tray Replacement .