FixVault

Installation Procedure

    Fig 1: CKP Sensor And Hold Down Bolt
    GM181701Courtesy of GENERAL MOTORS CORP.
  1. Install the CKP sensor (1) into the front cover of the engine block.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the CKP sensor hold down bolt (2).

    Tighten:  Tighten the hold down bolt to 9 N.m (80 lb in).

  4. Connect the CKP sensor electrical connector.
  5. Fig 2: Stone Shield, Four Retainers And Two Bolts
    GM830841Courtesy of GENERAL MOTORS CORP.
  6. Install the stone shield (1) with the four retainers (2).
  7. Secure the stone shield (1) with the two bolts (3).

    Tighten:  Tighten the two shield bolts to 10 N.m (89 lb in).

  8. Lower the vehicle.