FixVault

Installation Procedure

    Fig 1: View Of Knee Bolster Assembly
    GM318206Courtesy of GENERAL MOTORS CORP.
  1. Perform the following steps in order to install the knee bolster to the instrument panel:
    1. Align the clips with the slots in the instrument panel.
    2. Push in, in order to secure the knee bolster.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the bolts to the bottom of the knee bolster.

    Tighten:  Tighten the bolts/screws to 2.5 N.m (22 lb in).

  4. Install the IP insulator. Refer to Closeout/Insulator Panel Replacement - Right  and Closeout/Insulator Panel Replacement - Left .