FixVault

Installation Procedure

  1. Install the quarter window into the opening. Refer to Urethane Adhesive Installation of Stationary Windows .
  2. Remove the double layer of masking tape around the perimeter of the painted surfaces and the interior trim.
  3. Install the upper quarter trim panel. Refer to Trim Panel Replacement - Rear Quarter Upper in Interior Trim.