FixVault

Installation Procedure

  1. Install the quarter window into the opening. Refer to Urethane Adhesive Installation of Stationary Windows .
  2. Remove the double layer of masking tape around the perimeter of the painted surfaces and the interior trim.
  3. Install the upper quarter trim panel. Refer to Rear Quarter Upper Trim Panel Replacement .